top of page

71 KINGSWAY

CAT-A Refurbishment _ 391sqm _ RIBA Stage 0-7_ Duration: 18 Weeks

Our client from 44 Paul Street, invited us back to take on a similar scheme for 71 Kingsway, Holborn.


Spread over two floors, both the 6th and 4th floor required a complete strip out and replaced with new decorative finishes, new raised access floor, common parts refurbishment. The 6th Floor required a new roof lantern installation and repair, to tie the scheme together we matched the colour for the lantern to the light fittings creating a modern feel to the space with added character.

bottom of page